Article 2 - Adoption of Regulations

California Government Code — §§ 65850-65863.13

Showing inline text for up to 20 sections. Open a section link to read its full text.

Sections (51)

Amended by Stats. 2017, Ch. 376, Sec. 1. (AB 1505) Effective January 1, 2018.

The legislative body of any county or city may, pursuant to this chapter, adopt ordinances that do any of the following:

(a)Regulate the use of buildings, structures, and land as between industry, business, residences, open space, including agriculture, recreation, enjoyment of scenic beauty, use of natural resources, and other purposes.
(b)Regulate signs and billboards.
(c)Regulate all of the following:
(1)The location, height, bulk, number of stories, and size of buildings and

structures.

(2)The size and use of lots, yards, courts, and other open spaces.
(3)The percentage of a lot which may be occupied by a building or structure.
(4)The intensity of land use.
(d)Establish requirements for offstreet parking and loading.
(e)Establish and maintain building setback lines.
(f)Create civic districts around civic centers, public parks, public buildings, or public grounds, and establish regulations for those civic districts.
(g)Require, as a condition of

the development of residential rental units, that the development include a certain percentage of residential rental units affordable to, and occupied by, households with incomes that do not exceed the limits for moderate-income, lower income, very low income, or extremely low income households specified in Sections 50079.5, 50093, 50105, and 50106 of the Health and Safety Code. The ordinance shall provide alternative means of compliance that may include, but are not limited to, in-lieu fees, land dedication, off-site construction, or acquisition and rehabilitation of existing units.

Amended by Stats. 2023, Ch. 770, Sec. 5. (AB 1764) Effective January 1, 2024.

(a)The Department of Housing and Community Development, hereafter referred to as “the department” in this section, shall have the authority to review an ordinance adopted or amended by a county or city after September 15, 2017, that requires as a condition of the development of residential rental units that more than 15 percent of the total number of units rented in a development be affordable to, and occupied by, households at 80 percent or less of the area median income if either of the following apply:
(1)The county or city has failed to meet at least 75 percent of its share of the regional housing need allocated pursuant to Sections 65584.04, 65584.05, and 65584.06, as applicable for the above-moderate income category specified in Section 50093 of the

Health and Safety Code, prorated based on the length of time within the planning period pursuant to paragraph (1) of subdivision (f) of Section 65588, over at least a five-year period. This determination shall be made based on the annual housing element report submitted to the department pursuant to paragraph (2) of subdivision (a) of Section 65400.

(2)The department finds that the jurisdiction has not submitted the annual housing element report as required by paragraph (2) of subdivision (a) of Section 65400 for at least two consecutive years.
(b)Based on a finding pursuant to subdivision (a), the department may request, and the county or city shall provide, evidence that the ordinance does not unduly constrain the production of housing by submitting an economic feasibility study. The county or city shall submit the study within 180 days from receipt of the department’s

request. The department’s review of the feasibility study shall be limited to determining whether or not the study meets the following standards:

(1)A qualified entity with demonstrated expertise preparing economic feasibility studies prepared the study.
(2)If the economic feasibility study is prepared after September 15, 2017, the county or city has made the economic feasibility study available for at least 30 days on its internet website. After 30 days, the county or city shall include consideration of the economic feasibility study on the agenda for a regularly scheduled meeting of the legislative body of the county or city prior to consideration and approval. This paragraph applies when an economic feasibility study is completed at the request of the department or prepared in connection with the ordinance.
(3)The study methodology followed best professional practices and was sufficiently rigorous to allow an assessment of whether the rental inclusionary requirement, in combination with other factors that influence feasibility, is economically feasible.
(c)If the economic feasibility study requested pursuant to subdivision (b) has not been submitted to the department within 180 days, the jurisdiction shall limit any requirement to provide rental units in a development affordable to households at 80 percent of the area median income to no more than 15 percent of the total number of units in a development until an economic feasibility study has been submitted to the department and the department makes a finding that the study meets the standards specified in paragraphs (1), (3), and, if applicable, (2), of subdivision (b).
(d)(1) Within 90 days of

submission, the department shall make a finding as to whether or not the economic feasibility study meets the standards specified in paragraphs (1), (3), and, if applicable, (2), of subdivision (b).

(2)If the department finds that the jurisdiction’s economic feasibility study does not meet the standards in paragraphs (1), (3), and, if applicable, (2), of subdivision (b), the jurisdiction shall have the right to appeal the decision to the Director of Housing and Community Development or their designee. The director or their designee shall issue a final decision within 90 days of the department’s receipt of the appeal unless extended by mutual agreement of the jurisdiction and the department.
(3)If in its final decision the department finds that jurisdiction’s economic feasibility study does not meet the standards in paragraphs (1), (3), and, if applicable, (2), of subdivision

(b), the jurisdiction shall limit any requirement to provide rental units in a development affordable to households at 80 percent of the area median income to no more than 15 percent of the total number of units in a development until such time as the jurisdiction submits an economic feasibility study that supports the ordinance under review and the department issues a finding that the study meets the standards in paragraphs (1), (3), and, if applicable, (2), of subdivision (b).

(e)The department shall not request to review an economic feasibility study for an ordinance more than 10 years from the date of adoption or amendment of the ordinance, whichever is later.
(f)The department shall annually report any findings made pursuant to this section to the Legislature in the annual report required by Section 50408 of the Health and Safety Code.
(g)The Legislature finds and declares that ensuring access to affordable housing is a matter of statewide concern and not a municipal affair, as that term is used in Section 5 of Article XI of the California Constitution. Therefore, this section shall apply to an ordinance proposed or adopted by any city, including a charter city.

Added by Stats. 2022, Ch. 635, Sec. 1. (AB 916) Effective January 1, 2023.

(a)Notwithstanding any other local law, with respect to land zoned for residential use, the legislative body of a city or county shall not adopt or enforce an ordinance requiring a public hearing as a condition of reconfiguring existing space to increase the bedroom count within an existing dwelling unit.
(b)This section shall only apply to a permit application for no more than two additional bedrooms within an existing dwelling unit.
(c)This section shall not be construed to prohibit a local agency from requiring a public hearing for a proposed project that would increase the number of

dwelling units within an existing structure.

(d)The Legislature finds and declares that ensuring adequate housing is a matter of statewide concern and is not a municipal affair, as that term is used in Section 5 of Article IX of the California Constitution. Therefore, this section applies to all cities, including charter cities.

Added by renumbering Section 65302.9 by Stats. 1996, Ch. 799, Sec. 4. Effective January 1, 1997.

(a)The legislative body of any city or county may adopt an ordinance or other regulation governing the issuance of permits to engage in the use of property for occasional commercial filming on location. This section shall not limit the discretion of a city or county to limit, condition, or deny the use of property for occasional commercial filming on location to protect the public health, safety, or welfare.
(b)All ordinances and regulations enacted by a city or county regulating by permit the use of property for occasional commercial filming on location shall not be subject to zoning ordinances or other land use regulations of that jurisdiction unless the filming ordinance or regulation expressly states that it is subject to, or governed by, those zoning ordinances or other land use regulations.
(c)The use of property for occasional commercial filming on location engaged in pursuant to a filming permit issued by a city or county shall be permitted in any zone unless the zoning ordinance or other land use regulations of the jurisdiction expressly prohibit filming in that zone.

Amended by Stats. 2021, Ch. 115, Sec. 23. (AB 148) Effective July 22, 2021.

(a)Each city and each county shall include, in its information list compiled pursuant to Section 65940 for development projects, or application form for projects that do not require a development permit other than a building permit, both of the following:
(1)The requirement that the owner or authorized agent shall indicate whether the owner or authorized agent will need to comply with the applicable requirements of Section 25505 and Article 2 (commencing with Section 25531) of Chapter 6.95 of Division 20 of the Health and Safety Code or the requirements for a permit for construction or modification from the air pollution control district or

air quality management district exercising jurisdiction in the area governed by the city or county.

(2)The requirement that the owner or authorized agent certify whether or not the proposed project will have more than a threshold quantity of a regulated substance in a process or will contain a source or modified source of hazardous air emissions.
(b)A city or county shall not find the application complete pursuant to Section 65943 or approve a development project or a building permit for a project that does not require a development permit other than a building permit, in which a regulated substance will be present in a process in quantities greater than the applicable threshold quantity, unless the owner or authorized agent for the project first obtains, from the administering

agency with jurisdiction over the facility, a notice of requirement to comply with, or determination of exemption from, the requirement to prepare and submit an RMP. Within five days of submitting the project application to the city or county, the applicant shall submit the information required pursuant to paragraph (2) of subdivision (a) to the administering agency. This notice of requirement to comply with, or determination of exemption from, the requirement for an RMP shall be provided by the administering agency to the applicant, and the applicant shall provide the notice to the city or county within 25 days of the administering agency receiving adequate information from the applicant to make a determination as to the requirement for an RMP. The requirement to submit an RMP to the administering agency shall be met prior to the issuance of a certificate of occupancy or its substantial equivalent.

The owner or authorized agent shall submit, to the city or county, certification from the air pollution control officer that the owner or authorized agent has provided the disclosures required pursuant to Section 42303 of the Health and Safety Code.

(c)A city or county shall not issue a final certificate of occupancy or its substantial equivalent unless there is verification from the administering agency, if required by law, that the owner or authorized agent has met, or is meeting, the applicable requirements of Section 25505 and Article 2 (commencing with Section 25531) of Chapter 6.95 of Division 20 of the Health and Safety Code, and the requirements for a permit, if required by law, from the air pollution control district or air quality management district exercising jurisdiction in the area governed by the city or county or has

provided proof from the appropriate district that the permit requirements do not apply to the owner or authorized agent.

(d)The city or county, after considering the recommendations of the administering agency or air pollution control district or air quality management district, shall decide whether, and under what conditions, to allow construction of the site.
(e)Nothing in this section limits any existing authority of a district to require compliance with its rules and regulations.
(f)Counties and cities may adopt a schedule of fees for applications for compliance with this section sufficient to recover their reasonable costs of carrying out this section. Those fees shall be used only for the implementation of this

section.

(g)As used in this section, the following terms have the following meaning:
(1)“Process,” “regulated substance,” “RMP,” and “threshold quantity” have the same meaning as set forth for those terms in Section 25532 of the Health and Safety Code.
(2)“Hazardous air emissions” means emissions into the ambient air of air contaminants that have been identified as a toxic air contaminant by the State Air Resources Board or by the air pollution control officer for the jurisdiction in which the project is located. As determined by the air pollution control officer, “hazardous air emissions” also means emissions into the ambient air of any substance identified in subdivisions (a) to (f), inclusive, of

Section 44321 of the Health and Safety Code.

(3)“Administering agency” means a unified program agency, as defined in Section 25501 of the Health and Safety Code.
(h)Any misrepresentation of information required by this section shall be grounds for denial, suspension, or revocation of project approval or permit issuance. The owner or authorized agent required to comply with this section shall notify all future occupants of their potential duty to comply with the requirements of Section 25505 and Article 2 (commencing with Section 25531) of Chapter 6.95 of Division 20 of the Health and Safety Code.
(i)This section does not apply to applications solely for residential construction.

Added by Stats. 2003, Ch. 50, Sec. 1. Effective January 1, 2004.

Any ordinance adopted by the legislative body of a city or county that regulates amateur radio station antenna structures shall allow those structures to be erected at heights and dimensions sufficient to accommodate amateur radio service communications, shall not preclude amateur radio service communications, shall reasonably accommodate amateur radio service communications, and shall constitute the minimum practicable regulation to accomplish the city’s or county’s legitimate purpose.

It is the intent of the Legislature in adding this section to the Government Code, to codify in state law the provisions of Section 97.15 of Title 47 of the Code of Federal Regulations, which expresses the Federal Communications Commission’s limited preemption of local regulations governing amateur radio station facilities.

Amended by Stats. 1999, Ch. 550, Sec. 18. Effective September 28, 1999. Operative January 1, 2000, by Sec. 33 of Ch. 550.

(a)The legislative body of any county or city may regulate, pursuant to a content neutral ordinance, the time, place, and manner of operation of sexually oriented businesses, when the ordinance is designed to serve a substantial governmental interest, does not unreasonably limit alternative avenues of communication, and is based on narrow, objective, and definite standards. The legislative body is entitled to rely on the experiences of other counties and cities and on the findings of court cases in establishing the reasonableness of the ordinance and its relevance to the specific problems it addresses, including the harmful secondary effects that the business may have on the community and its proximity to churches, schools, residences, establishments dispensing alcohol, and other sexually oriented businesses.
(b)For purposes of this section, a sexually oriented business is one whose primary purpose is the sale or display of matter that, because of its sexually explicit nature, may, pursuant to state law or local regulatory authority, be offered only to persons over the age of 18 years.
(c)This section shall not be construed to preempt the legislative body of any city or county from regulating a sexually oriented business or similar establishment in the manner and to the extent permitted by the United States Constitution and the California Constitution.
(d)It is the intent of the Legislature to authorize the legislative body of any city or county to enter into a legally sanctioned and appropriate cooperative agreement, consortium, or joint powers authority with other adjacent cities or counties regarding regulation of established negative secondary effects of adult or sexually oriented businesses if the actions taken by the legislative body are consistent with this section.
(e)The Legislature finds and declares that in order to encourage the legislative body of a city or county in regulating adult or sexually oriented businesses or similar businesses under this section, the legislative body may consider any harmful secondary effects such a business may have on adjacent cities and counties and its proximity to churches, schools, residents, and other businesses located in adjacent cities or counties.

Amended by Stats. 2019, Ch. 494, Sec. 2. (AB 754) Effective January 1, 2020.

(a)The implementation of consistent statewide standards to achieve the timely and cost-effective installation of solar energy systems is not a municipal affair, as that term is used in Section 5 of Article XI of the California Constitution, but is instead a matter of statewide concern. It is the intent of the Legislature that local agencies not adopt ordinances that create unreasonable barriers to the installation of solar energy systems, including, but not limited to, design review for aesthetic purposes, and not unreasonably restrict the ability of homeowners and agricultural and business concerns to install solar energy systems. It is the policy of the state to promote and encourage the use of solar energy systems and to limit obstacles to

their use. It is the intent of the Legislature that local agencies comply not only with the language of this section, but also the legislative intent to encourage the installation of solar energy systems by removing obstacles to, and minimizing costs of, permitting for such systems.

(b)A city or county shall administratively approve applications to install solar energy systems through the issuance of a building permit or similar nondiscretionary permit. Review of the application to install a solar energy system shall be limited to the building official’s review of whether it meets all health and safety requirements of local, state, and federal law. The requirements of local law shall be limited to those standards and regulations necessary to ensure that the solar energy system will not have a specific, adverse impact upon the public

health or safety. However, if the building official of the city or county makes a finding, based on substantial evidence, that the solar energy system could have a specific, adverse impact upon the public health and safety, the city or county may require the applicant to apply for a use permit.

(c)A city, county, or city and county may not deny an application for a use permit to install a solar energy system unless it makes written findings based upon substantial evidence in the record that the proposed installation would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact. The findings shall include the basis for the rejection of potential feasible alternatives of preventing the adverse impact.
(d)The decision of the building official pursuant to subdivisions (b) and (c) may be appealed to the planning commission of the city, county, or city and county.
(e)Any conditions imposed on an application to install a solar energy system shall be designed to mitigate the specific, adverse impact upon the public health and safety at the lowest cost possible.
(f)(1) A solar energy system shall meet applicable health and safety standards and requirements imposed by state and local permitting authorities.
(2)Solar energy systems for heating water in single family residences and solar collectors used for heating water in commercial or swimming pool applications shall be certified by an

accredited listing agency as defined in the California Plumbing and Mechanical Codes.

(3)A solar energy system for producing electricity shall meet all applicable safety and performance standards established by the California Electrical Code, the Institute of Electrical and Electronics Engineers, and accredited testing laboratories such as Underwriters Laboratories and, where applicable, rules of the Public Utilities Commission regarding safety and reliability.
(4)No later than January 1, 2021, an application to install a solar energy system shall include a reference to the requirement to notify the appropriate regional notification center of an excavator’s intent to excavate, pursuant to Article 2 (commencing with Section 4216) of Chapter 3.1 of Division 5 of Title 1, before conducting

an excavation, including, but not limited to, installing a grounding rod.

(5)No later than January 1, 2021, the Office of Planning and Research shall add a reference to the California Solar Permitting Guidebook regarding the requirement to notify the appropriate regional notification center of an excavator’s intent to excavate pursuant to Article 2 (commencing with Section 4216) of Chapter 3.1 of Division 5 of Title 1, before conducting an excavation, including, but not limited to, installing a grounding rod.
(6)A city, county, or city and county shall not be liable for any damages associated with the failure of a person required to

obtain a solar energy system permit to notify the

appropriate regional notification center of an intended excavation.

(g)(1) On or before September 30, 2015, every city, county, or city and county, in consultation with the local fire department or district and the utility director, if the city, county, or city and county operates a utility, shall adopt an ordinance, consistent with the goals and intent of subdivision (a), that creates an expedited, streamlined permitting process for small residential rooftop solar energy systems. In developing an expedited permitting process, the city, county, or city and county shall adopt a checklist of all requirements with

which small rooftop solar energy systems shall comply to be eligible for expedited review. An application that satisfies the information requirements in the checklist, as determined by the city, county, and city and county, shall be deemed complete. Upon confirmation by the city, county, or city and county of the application and supporting documents being complete and meeting the requirements of the checklist, and consistent with the ordinance, a city, county, or city and county shall, consistent with subdivision (b), approve the application and issue all required permits or authorizations. Upon receipt of an incomplete application, a city, county, or city and county shall issue a written correction notice detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance.

(2)The checklist and required permitting documentation shall be published on a publically accessible internet website if the city, county, or city and county has an

internet website and the city, county, or city and county shall allow for electronic submittal of a permit application and associated documentation, and shall authorize the electronic signature on all forms, applications, and other documentation in lieu of a wet signature by an applicant. In developing the ordinance, the city, county, or city and county shall substantially conform its expedited, streamlined permitting process with the recommendations for expedited permitting, including the checklists and standard plans contained in the most current version of the California Solar Permitting Guidebook and adopted by the Governor’s Office of Planning and Research. A city, county, or city and county may adopt an ordinance that modifies the checklists and standards found in the guidebook due to unique climactic, geological, seismological, or topographical conditions. If a city, county, or city

and county determines that it is unable to authorize the acceptance of an

electronic signature on all forms, applications, and other documents in lieu of a wet signature by an applicant, the city, county, or city and county shall state, in the ordinance required under this subdivision, the reasons for its inability to accept electronic signatures and acceptance of an electronic signature shall not be required.

(h)For a small residential rooftop solar energy system eligible for expedited review, only one inspection shall be required, which shall be done in a timely manner and may include a consolidated inspection, except that a separate fire safety inspection may be performed in a city, county, or city and county that does not have an agreement with a local fire authority to conduct a fire safety inspection on behalf of the fire authority. If a small residential rooftop solar energy system fails

inspection, a subsequent inspection is authorized, however the subsequent inspection need not conform to the requirements of this subdivision.

(i)A city, county, or city and county shall not condition approval for any solar energy system permit on the approval of a solar energy system by an association, as that term is defined in Section 4080 of the Civil Code.
(j)The following definitions apply to this section:
(1)“A feasible method to satisfactorily mitigate or avoid the specific, adverse impact” includes, but is not limited to, any cost-effective method, condition, or mitigation imposed by a city, county, or city and county on another similarly situated application in a prior successful application for a permit. A

city, county, or city and county shall use its best efforts to ensure that the selected method, condition, or mitigation meets the conditions of subparagraphs (A) and (B) of paragraph (1) of subdivision (d) of Section 714 of the Civil Code.

(2)“Electronic submittal” means the utilization of one or more of the following:
(A)Email.
(B)The Internet.
(C)Facsimile.
(3)“Small residential rooftop solar energy system” means all of the following:
(A)A solar energy system that is no larger than 10 kilowatts alternating current

nameplate rating or 30 kilowatts thermal.

(B)A solar energy system that conforms to all applicable state fire, structural, electrical, and other building codes as adopted or amended by the city, county, or city and county and paragraph (3) of subdivision (c) of Section 714 of the Civil Code.
(C)A solar energy system that is installed on a single or duplex family dwelling.
(D)A solar panel or module array that does not exceed the maximum legal building height as defined by the authority having jurisdiction.
(4)“Solar energy system” has the same meaning set forth in

paragraphs (1) and (2) of subdivision (a) of Section 801.5 of the Civil Code.

(5)“Specific, adverse impact” means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.

Amended by Stats. 2023, Ch. 131, Sec. 95. (AB 1754) Effective January 1, 2024.

(a)For purposes of this section, the following definitions apply:
(1)“Energy Commission” means the State Energy Resources Conservation and Development Commission.
(2)“Residential energy storage system” means commercially available technology, located behind a customer’s residential utility meter, that is capable of absorbing electricity generated from a colocated electricity generator or from the electrical grid, storing it for a period of time, and thereafter discharging it to meet the energy or power needs of the host customer or for export.
(3)“Residential solar energy system” means any configuration of solar energy devices that

collects and distributes solar energy for the purpose of generating electricity and that has a single residential interconnection with the electric utility transmission or distribution network.

(4)“SolarAPP+” means the most recent version of a web-based portal, developed by the National Renewable Energy Laboratory, that automates plan review, produces code-compliant approvals, and issues permits for residential solar energy systems and residential energy storage systems paired with residential solar energy systems.
(b)(1) Pursuant to the compliance schedule in subdivision (c), a city, county, or city and county, in consultation with the local fire department, district, or authority, shall implement an online, automated permitting platform, such as SolarAPP+, that meets both of the following requirements:

(A) The platform verifies code compliance and issues permits in real time or allows the city, county, or city and county to issue permits in real time to a licensed contractor for a residential solar energy system that is no larger than 38.4 kilowatts alternating current nameplate rating and a residential energy storage system paired with a residential solar energy system that is no larger than 38.4 kilowatts alternating current nameplate rating.

(B) The platform issues permits or allows the city, county, or city and county to issue permits for residential solar energy systems and residential energy storage systems paired with residential solar energy systems that SolarAPP+ is capable of processing.

(2)A city, county, or city and county is not required to permit an application for a residential solar energy system or a residential energy storage system paired with a

residential solar energy system through the online automated permitting platform pursuant to this section if the system configuration is not eligible for SolarAPP+ at the time the application is submitted to the jurisdiction.

(c)(1) A city with a population of fewer than 5,000 and a county with a population of fewer than 150,000, including each city within that county, is exempt from subdivision (b).
(2)A city with a population of 50,000 or fewer that is not exempt pursuant to paragraph (1) shall satisfy the requirements of subdivision (b) by September 30, 2024.
(3)A city, county, or city and county with a population of greater than 50,000 that is not exempt pursuant to paragraph (1) shall satisfy the requirements of subdivision (b) by September 30, 2023.
(d)A city, county, or city and county shall report to the Energy Commission when it is in compliance with subdivision (b).
(e)(1) The Energy Commission shall set guidelines for cities, counties, and cities and counties to report to the commission on the number of permits issued for residential solar energy systems and residential energy storage systems paired with residential solar energy systems and the relevant characteristics of those systems. A city, county, or city and county shall annually report to the Energy Commission pursuant to those guidelines within one year of implementing the online, automated solar permitting system pursuant to subdivision (b). This annual reporting requirement shall become inoperative on June 30, 2034.
(2)The Energy Commission shall adopt the guidelines required

by this subdivision through a public process that shall include, but shall not be limited to, both of the following requirements:

(A)The Energy Commission shall make the proposed guidelines available for public comment for at least 30 days prior to adopting the guidelines.
(B)The Energy Commission shall respond in writing to a public comment received during the period required by subparagraph (A).
(3)The Administrative Procedure Act (Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2) shall not apply to the adoption of guidelines pursuant to this subdivision.
(f)A city, county, or city and county shall self-certify its compliance with this section when applying for funds from the Energy Commission after the applicable

date in the compliance schedule in subdivision (c). This subdivision shall not apply to the twenty million dollars ($20,000,000) in funds available, pursuant to Section 76 of Chapter 69 of the Statutes of 2021, from the Energy Commission for automated solar permitting.

(g)This section does not limit or otherwise affect the generator interconnection requirements and approval process for a local publicly owned electric utility, as defined in Section 224.3 of the Public Utilities Code, or an electrical corporation, as defined in Section 218 of the Public Utilities Code.
(h)All liabilities and immunities, including, but not limited to, the immunities provided in Sections 818.4, 818.6, and 821.2, applicable to cities, counties, and cities and counties shall apply to any permits issued through an online, automated permitting platform and any inspections conducted in connection with

those permits.

(i)For the purposes of this section, a city shall include a charter city.

Added by Stats. 2012, Ch. 538, Sec. 1. (AB 1801) Effective January 1, 2013.

(a)(1) The Legislature finds and declares that oversight of permitting fees for solar energy systems is a matter of statewide concern and not a municipal affair, as that term is used in Section 5 of Article XI of the California Constitution. Therefore this act shall apply to all cities, including charter cities. The Legislature further finds and declares that nothing in this bill is intended to imply approval of any other local fees for solar systems not specifically covered by this bill.
(2)For purposes of this section, the term “solar energy system” shall have the same meaning as set forth by subdivision (a) of Section 801.5 of the Civil

Code.

(b)A city, county, or city and county,

in determining fees charged for the installation of a solar energy system, shall not do either of the following:

(1)Base the calculation of the fee on the valuation of the solar energy system, or any other factor not directly associated with the cost to issue the permit.
(2)Base the calculation of the fee on the valuation of the property on which the improvement is planned, or the

improvement, materials, or labor costs associated with the improvement.

(c)A city, county, or city and county shall separately identify each fee assessed on an applicant for the installation of a solar energy system on the invoice provided to the applicant.

Amended by Stats. 2017, Ch. 561, Sec. 93. (AB 1516) Effective January 1, 2018.

(a)A colocation facility shall be a permitted use not subject to a city or county discretionary permit if it satisfies the following requirements:
(1)The colocation facility is consistent with requirements for the wireless telecommunications colocation facility pursuant to subdivision (b) on which the colocation facility is proposed.
(2)The wireless telecommunications colocation facility on which the colocation facility is proposed was subject to a discretionary permit by the city or county and an environmental impact report was certified, or a negative declaration or mitigated negative declaration was adopted for the wireless telecommunications colocation

facility in compliance with the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code); the requirements of Section 21166 do not apply; and the colocation facility incorporates required mitigation measures specified in that environmental impact report, negative declaration, or mitigated negative declaration.

(b)A wireless telecommunications colocation facility, where a subsequent colocation facility is a permitted use not subject to a city or county discretionary permit pursuant to subdivision (a), shall be subject to a city or county discretionary permit issued on or after January 1, 2007, and shall comply with all of the following:
(1)City or county requirements for a wireless telecommunications colocation facility that specifies types of wireless telecommunications facilities that are allowed to include a colocation

facility, or types of wireless telecommunications facilities that are allowed to include certain types of colocation facilities; height, location, bulk, and size of the wireless telecommunications colocation facility; percentage of the wireless telecommunications colocation facility that may be occupied by colocation facilities; and aesthetic or design requirements for the wireless telecommunications colocation facility.

(2)City or county requirements for a proposed colocation facility, including any types of colocation facilities that may be allowed on a wireless telecommunications colocation facility; height, location, bulk, and size of allowed colocation facilities; and aesthetic or design requirements for a colocation facility.
(3)State and local requirements, including the general plan, any applicable community plan or specific plan, and zoning ordinance.
(4)The California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) through certification of an environmental impact report, or adoption of a negative declaration or mitigated negative declaration.
(c)The city or county shall hold at least one public hearing on the discretionary permit required pursuant to subdivision (b) and notice shall be given pursuant to Section 65091, unless otherwise required by this division.
(d)For purposes of this section, the following definitions apply:
(1)“Colocation facility” means the placement or installation of wireless facilities, including antennas, and related equipment, on, or immediately adjacent to, a wireless telecommunications colocation facility.
(2)“Wireless telecommunications facility” means equipment and network components such as towers, utility poles, transmitters, base stations, and emergency power systems that are integral to providing wireless telecommunications services.
(3)“Wireless telecommunications colocation facility” means a wireless telecommunications facility that includes colocation facilities.
(e)The Legislature finds and declares that a colocation facility, as defined in this section, has a significant economic impact in California and is not a municipal affair as that term is used in Section 5 of Article XI of the California Constitution, but is a matter of statewide concern.
(f)With respect to the consideration of the environmental effects of radio frequency emissions, the

review by the city or county shall be limited to that authorized by Section 332(c)(7) of Title 47 of the United States Code, or as that section may be hereafter amended.

Current Version

Amended (as amended by Stats. 2022, Ch. 373, Sec. 1) by Stats. 2024, Ch. 607, Sec. 1. (SB 1418) Effective January 1, 2025. Repealed as of January 1, 2030, by its own provisions. See later operative version, as amended by Sec. 2 of Stats. 2024, Ch. 607.

(a)The Legislature finds and declares all of the following:
(1)The implementation of consistent statewide standards to achieve the timely and cost-effective installation of electric vehicle charging stations and hydrogen-fueling stations is not a municipal affair, as that term is used in Section 5 of Article XI of the California Constitution, but is instead a matter of statewide concern. Therefore, this section applies to all cities, including charter cities.
(2)It is the intent of the Legislature that local agencies not adopt ordinances that create unreasonable barriers to the installation of zero-emission vehicle infrastructure and not unreasonably restrict the ability of homeowners and

agricultural and business concerns to install electric vehicle charging and hydrogen-fueling stations.

(3)It is the policy of the state to promote and encourage the use of electric vehicle charging stations and hydrogen-fueling stations and to limit obstacles to their use.
(4)It is the intent of the Legislature that local agencies comply not only with the language of this section, but also the legislative intent to encourage the installation of electric vehicle charging stations and hydrogen-fueling stations by removing obstacles to, and minimizing costs of, permitting for charging and hydrogen-fueling stations so long as the action does not supersede the building official’s authority to identify and address higher priority life-safety situations.
(b)(1) A city, county, or city and county

shall administratively approve an application to install electric vehicle charging stations through the issuance of a building permit or similar nondiscretionary permit.

(2)A city, county, or city and county shall administratively approve an application to install hydrogen-fueling stations through the issuance of a building permit or similar nondiscretionary permit. This paragraph shall only apply to an application to install hydrogen-fueling stations on a parcel that satisfies either of the following:
(A)It is zoned for industrial or commercial development and does not contain any residential units.
(B)It was previously developed with service station. For purposes of this subparagraph, “service station” means any establishment which offers for sale or sells gasoline or other motor vehicle fuel to the public.
(3)Review of an application to install an electric vehicle charging station or hydrogen-fueling station shall be limited to the building official’s review of whether it meets all health and safety requirements of local, state, and federal law. The requirements of local law shall be limited to those standards and regulations necessary to ensure that the electric vehicle charging station or hydrogen-fueling station will not have a specific, adverse impact upon the public health or safety. However, if the building official of the city, county, or city and county makes a finding, based on substantial evidence, that the electric vehicle charging station or hydrogen-fueling station could have a specific, adverse impact upon the public health or safety, the city, county, or city and county may require the applicant to apply for a use permit.
(c)A city, county, or city and county may not

deny an application for a use permit to install an electric vehicle charging station or hydrogen-fueling station unless it makes written findings based upon substantial evidence in the record that the proposed installation would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact. The findings shall include the basis for the rejection of potential feasible alternatives of preventing the adverse impact.

(d)The decision of the building official pursuant to subdivisions (b) and (c) may be appealed to the planning commission of the city, county, or city and county.
(e)Any conditions imposed on an application to install an electric vehicle charging station or hydrogen-fueling station shall be designed to mitigate the specific, adverse impact upon the public health or safety

at the lowest cost possible.

(f)(1) An electric vehicle charging station or hydrogen-fueling station shall meet applicable health and safety standards and requirements imposed by state and local permitting authorities.
(2)An electric vehicle charging station shall meet all applicable safety and performance standards established by the California Electrical Code, the Society of Automotive Engineers, the National Electrical Manufacturers Association, and accredited testing laboratories such as Underwriters Laboratories and, where applicable, rules of the Public Utilities Commission regarding safety and reliability, or rules of the Department of Food and Agriculture regarding safety, reliability, weights, and measures.
(3)A hydrogen-fueling station shall meet all of the following, as

applicable:

(A)Safety and performance standards established by the Society of Automotive Engineers and accredited nationally recognized testing laboratories.
(B)All applicable state laws and regulations pertaining to hydrogen fueling, including any rules established by the State Air Resources Board, Energy Commission, or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
(C)Guidance established by the Governor’s Office of Business and Economic Development, as outlined in the Hydrogen Station Permitting Guidebook.
(g)(1) (A) On or before September 30, 2016, every city, county, or city and county with a population of 200,000 or more residents, and, on or before September

30, 2017, every city, county, or city and county with a population of less than 200,000 residents, shall, in consultation with the local fire department or district and the utility director, if the city, county, or city and county operates a utility, adopt an ordinance, consistent with the goals and intent of this section, that creates an expedited, streamlined permitting process for electric vehicle charging stations. In developing an expedited permitting process, the city, county, or city and county shall adopt a checklist of all requirements with which electric vehicle charging stations shall comply to be eligible for expedited review.

(B) On or before September 30, 2025, every city, county, or city and county with a population of 250,000 or more residents, and, on or before September 30, 2028, every city, county, or city and county with a population of fewer than 250,000 residents, shall, in consultation with the local fire department or

district and the utility director, if the city, county, or city and county operates a utility, adopt an ordinance, consistent with the goals and intent of this section, that creates an expedited, streamlined permitting process for hydrogen-fueling stations that meet the requirements of paragraph (2) of subdivision (b). In developing an expedited permitting process, the city, county, or city and county shall adopt a checklist of all requirements with which hydrogen-fueling stations shall comply to be eligible for expedited review.

(2)An application that satisfies the information requirements in either checklist adopted pursuant to paragraph (1), as determined by the city, county, or city and county, shall be deemed complete. Upon confirmation by the city, county, or city and county of the application and supporting documents being complete and meeting the requirements of the checklist, and consistent with the ordinance, a city, county, or city

and county shall, consistent with subdivision (b), approve the application and issue all required permits or authorizations. However, the city, county, or city and county may establish a process to prioritize competing applications for expedited permits. Upon receipt of an incomplete application, a city, county, or city and county shall issue a written correction notice detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance. An application submitted to a city, county, or city and county that owns and operates an electric utility shall demonstrate compliance with the utility’s interconnection policies prior to approval.

(3)Each checklist and required permitting documentation shall be published on a publicly accessible internet website, if the city, county, or city and county has an internet website, and the city, county, or city and county shall allow for electronic

submittal of a permit application and associated documentation, and shall authorize the electronic signature on all forms, applications, and other documentation in lieu of a wet signature by an applicant. In developing the ordinance, the city, county, or city and county may refer to the recommendations contained in the most current version of the “Electric Vehicle Charging Station Permitting Guidebook” or the “Hydrogen Station Permitting Guidebook” published by the Governor’s Office of Business and Economic Development. A city, county, or city and county may adopt an ordinance that modifies the checklists and standards found in the guidebooks due to unique climactic, geological, seismological, or topographical conditions. If a city, county, or city and county determines that it is unable to authorize the acceptance of an electronic signature on all forms, applications, and other documents in lieu of a wet signature by an applicant, the city, county, or city and county shall state, in the ordinance required

under this subdivision, the reasons for its inability to accept electronic signatures and acceptance of an electronic signature shall not be required.

(h)A city, county, or city and county shall not condition approval for any electric vehicle charging station or hydrogen-fueling station permit on the approval of the station by an association, as that term is defined in Section 4080 of the Civil Code.
(i)The following definitions shall apply to this section:
(1)“A feasible method to satisfactorily mitigate or avoid the specific, adverse impact” includes, but is not limited to, any cost-effective method, condition, or mitigation imposed by a city, county, or city and county on another similarly situated application in a prior successful application for a permit.
(2)“Electronic submittal” means the utilization of one or more of the following:
(A)Email.
(B)The internet.
(C)Facsimile.
(3)“Electric vehicle charging station” or “charging station” means any level of electric vehicle supply equipment station that is designed and built in compliance with Article 625 of the California Electrical Code, as it reads on the effective date of this section, and delivers electricity from a source outside an electric vehicle into a plug-in electric vehicle.
(4)“Hydrogen-fueling station” means the equipment and structural design components necessary to ensure the safety of the fueling station, including hydrogen-refueling canopies, that are used

to store and dispense hydrogen fuel to vehicles according to industry codes and standards that are open to the public.

(5)“Specific, adverse impact” means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.
(j)This section shall remain in effect only until January 1, 2030, and as of that date is repealed.
Future Version

Amended (as added by Stats. 2022, Ch. 373, Sec. 2) by Stats. 2024, Ch. 607, Sec. 2. (SB 1418) Effective January 1, 2025. Operative January 1, 2030, by its own provisions.

(a)The Legislature finds and declares all of the following:
(1)The implementation of consistent statewide standards to achieve the timely and cost-effective installation of electric vehicle charging stations is not a municipal affair, as that term is used in Section 5 of Article XI of the California Constitution, but is instead a matter of statewide concern. Therefore, this section applies to all cities, including charter cities.
(2)It is the intent of the Legislature that local agencies not adopt ordinances that create unreasonable barriers to the installation of electric vehicle charging stations and not unreasonably restrict the ability of homeowners and agricultural and business concerns to

install electric vehicle charging stations.

(3)It is the policy of the state to promote and encourage the use of electric vehicle charging stations and to limit obstacles to their use.
(4)It is the intent of the Legislature that local agencies comply not only with the language of this section, but also the legislative intent to encourage the installation of electric vehicle charging stations by removing obstacles to, and minimizing costs of, permitting for charging stations so long as the action does not supersede the building official’s authority to identify and address higher priority life-safety situations.
(b)A city, county, or city and county shall administratively approve an application to install electric vehicle charging stations through the issuance of a building permit or similar nondiscretionary permit.

Review of the application to install an electric vehicle charging station shall be limited to the building official’s review of whether it meets all health and safety requirements of local, state, and federal law. The requirements of local law shall be limited to those standards and regulations necessary to ensure that the electric vehicle charging station will not have a specific, adverse impact upon the public health or safety. However, if the building official of the city, county, or city and county makes a finding, based on substantial evidence, that the electric vehicle charging station could have a specific, adverse impact upon the public health or safety, the city, county, or city and county may require the applicant to apply for a use permit.

(c)A city, county, or city and county may not deny an application for a use permit to install an electric vehicle charging station unless it makes written findings based upon substantial evidence

in the record that the proposed installation would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact. The findings shall include the basis for the rejection of potential feasible alternatives of preventing the adverse impact.

(d)The decision of the building official pursuant to subdivisions (b) and (c) may be appealed to the planning commission of the city, county, or city and county.
(e)Any conditions imposed on an application to install an electric vehicle charging station shall be designed to mitigate the specific, adverse impact upon the public health or safety at the lowest cost possible.
(f)(1) An electric vehicle charging station shall meet applicable health and safety

standards and requirements imposed by state and local permitting authorities.

(2)An electric vehicle charging station shall meet all applicable safety and performance standards established by the California Electrical Code, the Society of Automotive Engineers, the National Electrical Manufacturers Association, and accredited testing laboratories such as Underwriters Laboratories and, where applicable, rules of the Public Utilities Commission regarding safety and reliability, or rules of the Department of Food and Agriculture regarding safety, reliability, weights, and measures.
(g)(1) On or before September 30, 2016, every city, county, or city and county with a population of 200,000 or more residents, and, on or before September 30, 2017, every city, county, or city and county with a population of less than 200,000 residents, shall, in consultation with

the local fire department or district and the utility director, if the city, county, or city and county operates a utility, adopt an ordinance, consistent with the goals and intent of this section, that creates an expedited, streamlined permitting process for electric vehicle charging stations. In developing an expedited permitting process, the city, county, or city and county shall adopt a checklist of all requirements with which electric vehicle charging stations shall comply to be eligible for expedited review. An application that satisfies the information requirements in the checklist, as determined by the city, county, or city and county, shall be deemed complete. Upon confirmation by the city, county, or city and county of the application and supporting documents being complete and meeting the requirements of the checklist, and consistent with the ordinance, a city, county, or city and county shall, consistent with subdivision (b), approve the application and issue all required permits or

authorizations. However, the city, county, or city and county may establish a process to prioritize competing applications for expedited permits. Upon receipt of an incomplete application, a city, county, or city and county shall issue a written correction notice detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance. An application submitted to a city, county, or city and county that owns and operates an electric utility shall demonstrate compliance with the utility’s interconnection policies prior to approval.

(2)The checklist and required permitting documentation shall be published on a publicly accessible internet website, if the city, county, or city and county has an internet website, and the city, county, or city and county shall allow for electronic submittal of a permit application and associated documentation, and shall authorize the electronic signature on

all forms, applications, and other documentation in lieu of a wet signature by an applicant. In developing the ordinance, the city, county, or city and county may refer to the recommendations contained in the most current version of the “Electric Vehicle Charging Station Permitting Guidebook” published by the Governor’s Office of Business and Economic Development. A city, county, or city and county may adopt an ordinance that modifies the checklists and standards found in the guidebook due to unique climactic, geological, seismological, or topographical conditions. If a city, county, or city and county determines that it is unable to authorize the acceptance of an electronic signature on all forms, applications, and other documents in lieu of a wet signature by an applicant, the city, county, or city and county shall state, in the ordinance required under this subdivision, the reasons for its inability to accept electronic signatures and acceptance of an electronic signature shall not be required.

(h)A city, county, or city and county shall not condition approval for any electric vehicle charging station permit on the approval of an electric vehicle charging station by an association, as that term is defined in Section 4080 of the Civil Code.
(i)The following definitions shall apply to this section:
(1)“A feasible method to satisfactorily mitigate or avoid the specific, adverse impact” includes, but is not limited to, any cost-effective method, condition, or mitigation imposed by a city, county, or city and county on another similarly situated application in a prior successful application for a permit.
(2)“Electronic submittal” means the utilization of one or more of the following:
(A)Email.
(B)The internet.
(C)Facsimile.
(3)“Electric vehicle charging station” or “charging station” means any level of electric vehicle supply equipment station that is designed and built in compliance with Article 625 of the California Electrical Code, as it reads on the effective date of this section, and delivers electricity from a source outside an electric vehicle into a plug-in electric vehicle.
(4)“Specific, adverse impact” means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.
(j)This

section shall become operative on January 1, 2030.

Added by Stats. 2021, Ch. 710, Sec. 2. (AB 970) Effective January 1, 2022.

(a)The Legislature finds and declares both of the following:
(1)An electric vehicle charging station has a significant economic impact in California and is not a municipal affair, as the term is used in Section 5 of Article XI of the California Constitution, but is instead a matter of statewide concern. Therefore, this section applies to all cities, including charter cities.
(2)Table 3 of the Governor’s Office of Business and Economic Development (GO-Biz) Electric Vehicle Charging Station Permitting Guidebook, published July 2019, recommends best practices for electric vehicle supply equipment permitting that would establish a 15-day timeline and satisfy the intent of Assembly

Bill 1236 (Chapter 598 of the Statutes of 2015).

(b)(1) An application to install an electric vehicle charging station submitted to the building official of a city, county, or city and county shall be deemed complete if, after the applicable time period described in paragraph (2) has elapsed, both of the following are true:

(A) The building official of the city, county, or city and county has not deemed the application complete, consistent with the checklist created by the city, county, or city and county pursuant to subdivision (g) of Section 65850.7.

(B) The building official of the city, county, or city and county has not issued a written correction notice detailing all deficiencies in the application and identifying any additional information explicitly necessary for

the building official to complete a review limited to whether the electric vehicle charging station meets all health and safety requirements of local, state, and federal law, consistent with subdivisions (b) and (g) of Section 65850.7.

(2)For purposes of paragraph (1), “applicable time period means” either of the following:
(A)Five business days after submission of the application to the city, county, or city and county, if the application is for at least 1, but not more than 25 electric vehicle charging stations at a single site.
(B)Ten business days after submission of the application to the city, county, or city and county, if the application is for more than 25 electric vehicle charging stations at a single site.
(c)(1) An

application to install an electric vehicle charging station shall be deemed approved if the applicable time period described in paragraph (2) has elapsed and all of the following are true:

(A) The building official of the city, county, or city and county has not administratively approved the application pursuant to subdivision (b) of Section 65850.7.

(B) The building official of the city, county, or city and county has not made a finding, based on substantial evidence, that the electric vehicle charging station could have a specific adverse impact upon the public health or safety or required the applicant to apply for a use permit pursuant to subdivision (b) of Section 65850.7.

(C) The building official of the city, county, or city and county has not denied the permit pursuant to subdivision (c) of Section

65850.7.

(D) An appeal has not been made to the planning commission of the city, county, or city and county, pursuant to subdivision (d) of Section 65850.7.

(2)For purposes of paragraph (1), “applicable time period means” either of the following:
(A)Twenty business days after the application was deemed complete, if the application is for at least 1, but not more than 25 electric vehicle charging stations at a single site.
(B)Forty business days after the application was deemed complete, if the application is for more than 25 electric vehicle charging stations at a single site.
(d)If an electric vehicle charging station and any associated equipment interfere with, reduce, eliminate, or

in any way impact the required parking spaces for existing uses, the city, county, or city and county shall reduce the number of required parking spaces for the existing uses by the amount necessary to accommodate the electric vehicle charging station and any associated equipment.

(e)If the electric vehicle charging station is being installed in an area that receives electrical service from a local publicly owned electric utility, this section does not expand or restrict the local publicly owned electric utility’s role and responsibility in providing new electric service to the electric vehicle charging station in a manner consistent with safety, reliability, and engineering requirements.
(f)This section shall become operative on January 1, 2022, but for every city, county, or city and county with a population of less than 200,000 residents, this section shall apply beginning on

January 1, 2023.

Added by Stats. 2024, Ch. 567, Sec. 2. (AB 2427) Effective January 1, 2025.

(a)For purposes of this section, the following definitions apply:
(1)“Electric vehicle charging station” or “charging station” means any level of electric vehicle supply equipment station that is designed and built in compliance with Article 625 of the California Electrical Code (Part 3 of Title 24 of the California Code of Regulations), as it reads on the effective date of this section, and delivers electricity from a source outside an electric vehicle into a plug-in electric vehicle.
(2)“Local agency” means a city, including a charter city, county, or city and county.
(3)“Public right-of-way” means the area along or upon any public road or highway under the control of a local agency.
(b)A local agency shall:
(1)Develop a checklist that includes all of the information required for a complete application for a permit or other authorization to install an electric vehicle charging station within the public right-of-way.
(2)Identify all applicable fees and charges as part of the permitting or authorization process.
(3)Identify any criteria adopted by the governing body of the local agency to determine appropriate locations within the public right-of-way for installation of an electric vehicle charging station.
(c)As part of the process described in subdivision (b), local agencies shall consider the Electric Vehicle Charging Station Permitting Guidebook from the Governor’s Office of Business and Economic Development to support their implementation of this section.
(d)The information developed pursuant to this section shall be published on a publicly accessible internet website if the local agency has an internet website.
(e)A local agency that

determines that there are no appropriate locations within the public right-of-way for installation of an electric vehicle charging station shall publish that information pursuant to subdivision (d).

(f)(1) A local agency with a population of 250,000 or more residents shall comply with this section by January 1, 2027.
(2)A local agency with a population of fewer than 250,000 residents shall comply with this section by January 1, 2029.

Added by Stats. 2020, Ch. 255, Sec. 2. (AB 2421) Effective January 1, 2021. Repealed as of January 1, 2024, by its own provisions.

(a)For purposes of this section, the following terms have the following meanings:
(1)“Emergency standby generator” means a stationary generator used for the generation of electricity that meets the criteria set forth in paragraph (29) of subdivision (a) of Section 93115.4 of Title 17 of the California Code of Regulations.
(2)“Local agency” means a city, county, or city and county.
(3)“Macro cell tower site” means the place where wireless telecommunications equipment and network components, including towers, transmitters, base stations, and emergency powers necessary for providing wide area outdoor service, are located. A macro cell tower site does not include rooftop, small cell, or outdoor and indoor distributed antenna system sites.
(b)Notwithstanding any law affecting local permitting, an emergency standby generator proposed to be installed

to serve a macro cell tower site shall be a permitted use and a local agency shall review an application to install such emergency standby generator on an administrative, nondiscretionary basis if it meets all of the following requirements:

(1)The emergency standby generator is rated below 50 horsepower, compliant with applicable air quality regulations, has a double-wall storage tank, not to exceed 300 gallons, and is mounted on a concrete pad.
(2)The macro cell tower site at which the emergency standby generator is proposed to be

installed is an existing site that was previously permitted by the applicable local agency.

(3)The emergency standby generator complies with all applicable state and local laws and regulations, including building and fire safety codes.
(4)The physical dimensions of the emergency standby generator and storage tank are cumulatively no more than 250 cubic feet in volume.
(5)The emergency standby generator shall be located not more than 100 feet from the physical structure of the macro cell tower or base station.
(c)A local agency that receives a permit application to install an emergency standby generator that meets the requirements in subdivision
(b)shall approve or deny the application within 60 days of submittal of the application, subject to both of the following:
(1)If, within 10 days of submission, the local agency notifies the applicant in writing that the application is incomplete, then the 60-day period shall be

suspended. If the application is determined not to be complete, the local agency’s determination shall specify those parts of the application that are incomplete and shall indicate the manner in which they can be made complete, including a list and thorough description of the specific information needed to complete the application. In any subsequent review of the application determined to be incomplete, the local agency shall not request the applicant to provide any new information that was not stated in the initial list of items that were not complete. Upon receipt of any resubmittal of the application, a new 60-day period shall begin, during which the local agency shall determine the completeness of the application.

(2)The local agency shall not require any new or different information for the permit applications than it

routinely requires for applications for other emergency standby generators.

(d)(1) A completed application that the local agency has not approved or denied within 60 days of receiving the application or upon expiration of any tolling period shall be deemed approved.
(2)This section does not prohibit a local agency from revoking, through the appropriate process, the permit or approval status for an emergency standby generator that is determined to violate an applicable state or local law or regulation, including building and fire safety codes, or from otherwise enforcing state and local law with respect to the emergency standby generator.
(e)If the local agency requires more than one permit application for

the installation of an emergency standby generator, all applications submitted concurrently shall be issued within the same 60-day period set forth in subdivision (c).

(f)The local agency shall not require the applicant to submit proof of consent or other authorization from an underlying property owner as part of the initial application for an emergency standby generator permit; however, the applicant shall not install the emergency standby generator until the applicant provides documentation, if required, to the local agency.
(g)A local agency may impose a permit fee to cover its costs associated with administering this section. The fee shall not exceed the reasonable costs of providing the service for which the fee is charged and shall not be levied for general revenue purposes.
(h)This section shall remain in effect until January 1, 2024, and as of that date is repealed.

Added by Stats. 2017, Ch. 380, Sec. 2. (AB 546) Effective January 1, 2018.

(a)(1) On or before September 30, 2018, every city, including a charter city, county, or city and county with a population of 200,000 or more residents, and on or before January 31, 2019, every city, including a charter city, county, or city and county with a population of less than 200,000 residents, shall make all documentation and forms associated with the permitting of advanced energy storage available on a publicly accessible Internet Web site, if the city, county, or city and county has an Internet Web site.
(2)The city, county, or city and county shall allow for electronic submission of a permit application and associated documentation. The city, county, or city and county shall also authorize the electronic signature on all forms, applications, and other documentation in lieu of a wet signature by an applicant, unless the city, county, or city and county determines that it is unable to accept an electronic signature on all forms, applications, and other documents and makes a finding that states the reasons for that inability.
(b)The Governor’s Office of Planning and Research may, in consultation with local building officials, the State Fire Marshal, the

storage industry, labor representatives from the utility and construction industries, licensed electrical contractors, electrical corporations, publicly owned utilities, the Public Utilities Commission, and other stakeholders, provide guidance on energy storage permitting, including streamlining, best practices, and potential factors for consideration by local government in establishing fees for permitting and inspection.

(c)For purposes of this section, the following terms have the following meanings:
(1)“Advanced energy storage” means an energy storage system, as defined in Section 2835 of the Public

Utilities Code, as well as an energy storage system that is designed to provide backup energy services in the event of a grid outage, that is limited to both of the following:

(A)Electrochemical energy storage in nonventing packages.
(B)Customer-sited installations.
(2)“Customer sited” means the system is interconnected to the electrical grid through an existing retail customer interconnection.
(3)“Electronic submittal” means the utilization of one or more of the following:
(A)Email.
(B)The Internet.
(C)Facsimile.

Added by Stats. 2018, Ch. 368, Sec. 2. (SB 1000) Effective January 1, 2019.

(a)A city, county, or city and county shall not restrict which types of electric vehicles, including, but not limited to, plug-in hybrid vehicles, may access an electric vehicle charging station approved for passenger vehicles that both is publicly accessible and the construction of which was funded, at least in part, by the state or through moneys collected from ratepayers.
(b)“Electric vehicle charging station” means any level of electric vehicle supply equipment station that is designed and built in compliance with Article 625 of the California Electrical Code, as it reads on the effective date of this section, and that delivers electricity from a source outside an electric vehicle into a plug-in electric

vehicle.

Repealed and added by Stats. 1965, Ch. 1880.

For such purposes the legislative body may divide a county, a city, or portions thereof, into zones of the number, shape and area it deems best suited to carry out the purpose of this chapter.

Repealed and added by Stats. 1965, Ch. 1880.

All such regulations shall be uniform for each class or kind of building or use of land throughout each zone, but the regulation in one type of zone may differ from those in other types of zones.

Amended by Stats. 2024, Ch. 7, Sec. 10. (SB 477) Effective March 25, 2024. Inoperative January 1, 2007, as prescribed by its own provisions.

(a)Notwithstanding Section 65906, any city, including a charter city, county, or city and county may issue a zoning variance, special use permit, or conditional use permit for a dwelling unit to be constructed, or which is attached to or detached from, a primary residence on a parcel zoned for a single-family residence, if the dwelling unit is intended for the sole occupancy of one adult or two adult persons who are 62 years of age or over, and the area of floorspace of the attached dwelling unit does not exceed 30 percent of the existing living area or the area of the floorspace of the detached dwelling unit does not exceed 1,200 square feet.

This section shall not be construed to limit the requirements of Article 2 (commencing with Section

66314) of Chapter 13, or the power of local governments to permit second units.

(b)This section shall become inoperative on January 1, 2007, and shall have no effect thereafter, except that any zoning variance, special use permit, or conditional use permit issued for a dwelling unit before January 1, 2007, pursuant to this section shall remain valid, and a dwelling unit constructed pursuant to such a zoning variance, special use permit, or conditional use permit shall be considered in compliance with all relevant laws, ordinances, rules, and regulations after January 1, 2007.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.