(A) Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sector’s percentage in achieving the economywide greenhouse gas emissions reductions pursuant to Section 38566 of the Health and Safety Code.
(B) Procure at least 60 percent eligible renewable energy resources by December 31, 2030, consistent with the state policy specified in Section 454.53 and Article 16 (commencing with Section 399.11) of Chapter 2.3.
(C) Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(D) Minimize impacts on ratepayers’ bills.
(E) (i) Ensure system and local reliability on a short-term, midterm, and long-term basis, including meeting the short-term and forecast long-term resource adequacy requirements of Section 380, and require sufficient, predictable resource procurement and development to avoid unplanned energy supply shortfalls by taking into account impacts due to climate change, forecasted levels of building and transportation
electrification, and other factors that can result in those shortfalls.
(ii) In furtherance of avoiding unplanned energy supply shortfalls or expensive emergency procurement and ensuring a more accurate understanding of electrical grid operational needs, the commission shall aggregate reported short-term and midterm resource procurement from all load-serving entities conducted under Section 380 or this section and assess midterm resource sufficiency, and annually provide anonymized reports to the Independent System Operator. The commission shall report forward resource procurement using counting conventions that provide the data to the Independent System Operator to be used in its grid planning.
(iii) To accomplish clause (i), the commission shall, as part of the integrated planning process, assess short-term, midterm, and long-term reliability by conducting probabilistic
reliability modeling, including if there is sufficient capacity available for procurement in the short term and midterm by all load-serving entities to meet their procurement requirements. The commission shall review the results of that reliability modeling in a public proceeding at the same frequency as the forecast conducted in accordance with this section. When modeling short-term and midterm reliability, the commission shall model all procurement consistent with clause (ii) and may rely upon or incorporate probabilistic reliability modeling conducted by the Energy Commission into the commission’s public process. The commission shall also report the modeling results in the joint Reliability Planning Assessments conducted under Section 25233 of the Public Resources Code.
(F) Comply with paragraph (1) of subdivision (b) of Section 399.13.
(G) Strengthen the diversity,
sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
(H) Enhance distribution systems and demand-side energy management.
(I) Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.
(J) Maintain a diverse portfolio of energy resources, which may include eligible energy resources procured by the Department of Water Resources.
resources or supply-side resources, taking into account the differing load-serving entities’ geographic service areas, to ensure that each load-serving entity meets the goals set forth in paragraph (1).
needs in hours to encompass the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority, as defined in Section 399.12, while reducing the need for new electricity generation resources and new transmission resources in achieving the state’s energy goals at the least cost to ratepayers.
Section 454.51.
solicitations and enter into contracts to procure eligible energy resources in order to achieve the policy of the state specified in Section 454.53.
(ii) Any contract entered into by the Department of Water Resources pursuant to clause (i) and approved by the commission pursuant to Section 80821 of the Water Code before January 1, 2035, shall remain in force for the duration of the contract.
directed by the commission and subject to commission review.
consistent with Section 454.51. The commission may order the procurement of resources with specific attributes by load-serving entities as a result of the integrated resource planning process and shall enforce any resource procurement requirements on a nondiscriminatory basis. Enforcement may include the assessment of penalties for noncompliance.
commission shall not include the energy, capacity, or any attribute from Diablo Canyon Unit 1 beyond November 1, 2024, or Unit 2 beyond August 26, 2025, in the adopted integrated resource plan portfolios, resource stacks, or preferred system plans.
meets all of the following requirements is eligible to be procured by the Department of Water Resources pursuant to this section:
(A) The resource directly supports attainment of the goals specified in Section 454.53 without increasing the state’s dependence on any fossil fuel-based resources.
(B) The resource is determined by the commission to not be under contract at sufficient levels as shown in load-serving entities’ most recent individual integrated resource plans submitted to and reviewed by the commission pursuant to this section to achieve the goals specified in Section 454.53.
(C) The resource has a construction and development lead time of at least five years.
(D) The resource does not generate electricity using fossil fuels or fuels derived
from fossil fuels.
(E) The resource does not use combustion to generate electricity, unless that combustion use is ancillary and necessary to facilitate geothermal electricity generation.