have the following meanings:
customers and that also conveys water to its customers.
Department of Corrections and Rehabilitation using a renewable electrical generation technology, or a combination of renewable electrical generation technologies, with a total capacity of not more than eight megawatts, that is located on the department’s owned, leased, or rented premises, and is interconnected and operates in parallel with the electrical grid, and is intended primarily to offset part or all of the facility’s own electrical requirements. The amount of any wind generation exported to the electrical grid shall not exceed 1.35 megawatt at any time.
(ii) Notwithstanding paragraph (2) of subdivision (e), an electrical corporation shall be afforded a prudent but necessary time, as determined by the executive director of the commission, to study the impacts of a request for interconnection of a renewable generator with a
capacity of greater than one megawatt under this subparagraph. If the study reveals the need for upgrades to the transmission or distribution system arising solely from the interconnection, the electrical corporation shall be afforded the time necessary to complete those upgrades before the interconnection and those costs shall be borne by the customer-generator. Upgrade projects shall comply with applicable
state and federal requirements, including requirements of the Federal Energy Regulatory Commission.
(ii) Notwithstanding subparagraph (A), a United States Armed Forces base or facility is an “eligible customer-generator” if the base or facility uses a renewable electrical generation facility, or a combination of those facilities, the renewable electrical generation facility is located on premises owned, leased, or rented by the United States Armed Forces base or facility, the renewable electrical generation facility is
interconnected and operates in parallel with the electrical grid, the renewable electrical generation facility is intended primarily to offset part or all of the base or facility’s own electrical requirements, and the renewable electrical generation facility has a generating capacity that does not exceed the lesser of 12 megawatts or one megawatt greater than the minimum load of the base or facility over the prior 36 months. Unless prohibited by federal law, a renewable electrical generation facility shall not be eligible for net energy metering for privatized military housing pursuant to this subparagraph if the renewable electrical generation facility was procured using a sole source process. A renewable electrical generation facility procured using best value criteria, if otherwise eligible, may be used for net energy metering for privatized military housing pursuant to this subparagraph.
For these purposes, “best value criteria” means a value determined by objective criteria and may include, but is not limited to, price, features, functions, and life-cycle costs.
(iii) A United States Armed Forces base or facility that is an eligible customer generator pursuant to this subparagraph shall not receive compensation for exported generation.
(iv) Notwithstanding paragraph (2) of subdivision (e), an electrical corporation shall be afforded a prudent but necessary time, as determined by the executive director of the commission but not less than 60 working days, to study the impacts of a request for interconnection of a renewable electrical generation facility with a capacity of greater than one megawatt pursuant to this subparagraph. If the study reveals the need for upgrades to the transmission
or distribution system arising solely from the interconnection, the electrical corporation shall be afforded the time necessary to complete those upgrades before the interconnection and the costs of those upgrades shall be borne by the eligible customer-generator. Upgrade projects shall comply with applicable state and federal requirements, including requirements of the Federal Energy Regulatory Commission. For any renewable generation facility that interconnects directly to the transmission grid or that requires transmission upgrades, the United States Armed Forces base or facility shall comply with all Federal Energy Regulatory Commission interconnection procedures and requirements.
(vi) This subparagraph shall not apply to a tariff made available pursuant to Section 2827.1.
electric utility to the eligible customer-generator during the same 12-month period.
local publicly owned electric utility, the local elected body responsible for setting the rates of the local publicly owned utility.
an eligible customer-generator and fed back to the electrical grid over a 12-month period is as described in subdivision (h). Wind energy co-metering shall be accomplished pursuant to Section 2827.8.
meter or meters to monitor the flow of electricity in each direction may be installed with the consent of the eligible customer-generator, at the expense of the electric utility, and the additional metering shall be used only to provide the information necessary to accurately bill or credit the eligible customer-generator pursuant to subdivision (h), or to collect generating system performance information for research purposes relative to a renewable electrical generation facility. If the existing electrical meter of an eligible customer-generator is not capable of measuring the flow of electricity in two directions, the eligible customer-generator shall be responsible for all expenses involved in purchasing and installing a meter that is able to measure electricity flow in two directions. If an additional meter or meters are installed, the net energy metering calculation shall yield a result identical to
that of a single meter. An eligible customer-generator that is receiving service other than through the standard contract or tariff may elect to receive service through the standard contract or tariff until the electric utility reaches the generation limit set forth in this paragraph. Once the generation limit is reached, only eligible customer-generators that had previously elected to receive service pursuant to the standard contract or tariff have a right to continue to receive service pursuant to the standard contract or tariff. Eligibility for net energy metering does not limit an eligible customer-generator’s eligibility for any other rebate, incentive, or credit provided by the electric utility, or pursuant to any governmental program, including rebates and incentives provided pursuant to the California Solar Initiative.
electrical corporation shall include a provision in the net energy metering contract or tariff requiring that any customer with an existing electrical generating facility and meter who enters into a new net energy metering contract shall provide an inspection report to the electrical corporation, unless the electrical generating facility and meter have been installed or inspected within the previous three years. The inspection report shall be prepared by a California licensed contractor who is not the owner or operator of the facility and meter. A California licensed electrician shall perform the inspection of the electrical portion of the facility and meter.
eligible customer-generators that are customers of that provider in the provider’s service area and the net surplus electricity purchased by the electric utility pursuant to this section.
paragraphs (1) and (4), an electric utility is not obligated to provide net energy metering to additional eligible customer-generators in its service area.
customer-generators, continuously and without interruption, until such times as the large electrical corporation reaches its net energy metering program limit or July 1, 2017,
whichever is earlier. A large electrical corporation reaches its program limit when the combined total peak demand of all electricity used by eligible customer-generators served by all the electric utilities in the large electrical corporation’s service area furnishing net energy metering to eligible customer-generators exceeds 5 percent of the aggregate customer peak demand of those electric utilities. For purposes of calculating a large electrical corporation’s program limit, “aggregate customer peak demand” means the highest sum of the noncoincident peak demands of all of the large electrical corporation’s customers that occurs in any calendar year. To determine the aggregate customer peak demand, every large electrical corporation shall use a uniform method approved by the commission. The program limit calculated pursuant to this paragraph shall not be less than the following:
(ii) For Southern California Edison Company, when it has made 2,240 megawatts of nameplate generating capacity available to eligible customer-generators.
(iii) For Pacific Gas and Electric Company, when it has made 2,409 megawatts of nameplate generating capacity available to eligible customer-generators.
(C) Every large electrical corporation shall file a monthly report with the commission detailing the progress toward the net energy metering program limit established in subparagraph (B). The report shall
include separate calculations on progress toward the limits based on operating solar energy systems, cumulative numbers of interconnection requests for net energy metering eligible systems, and any other criteria required by the commission.
(D) Beginning July 1, 2017, or upon reaching the net metering program limit of subparagraph (B), whichever is earlier, the obligation of a large electrical corporation to provide service pursuant to a standard contract or tariff shall be pursuant to Section 2827.1 and applicable state and federal requirements.
eligible customer-generator for an interconnection agreement.
to the customer.
structure, all retail rate components, and any monthly charges, to the contract or tariff to which the same customer would be assigned if the customer did not use a renewable electrical generation facility, except that eligible customer-generators shall not be assessed standby charges on the electrical generating capacity or the kilowatthour production of a renewable electrical generation facility. The charges for all retail rate components for eligible customer-generators shall be based exclusively on the customer-generator’s net kilowatthour consumption over a 12-month period, without regard to the eligible customer-generator’s choice as to from whom it purchases electricity that is not self-generated. Any new or additional demand charge, standby charge, customer charge, minimum monthly charge, interconnection charge, or any other charge that would increase an eligible customer-generator’s
costs beyond those of other customers who are not eligible customer-generators in the rate class to which the eligible customer-generator would otherwise be assigned if the customer did not own, lease, rent, or otherwise operate a renewable electrical generation facility is contrary to the intent of this section, and shall not form a part of net energy metering contracts or tariffs.
residential or small commercial customer-generator, at the end of each 12-month period following the date of final interconnection of the eligible customer-generator’s system with an electric utility, and at each anniversary date thereafter, shall be billed for electricity used during that 12-month period. The electric utility shall determine if the eligible residential or small commercial customer-generator was a net consumer or a net surplus customer-generator during that period.
shall be owed compensation for the eligible customer-generator’s net kilowatthour consumption over that 12-month period. The compensation owed for the eligible residential or small commercial customer-generator’s consumption shall be calculated as follows:
of electricity during that billing period, and if the number of kilowatthours generated exceeds the baseline quantity, the excess shall be valued at the same price per kilowatthour as the electric utility would charge for electricity over the baseline quantity during that billing period.
retail kilowatthour sales during that same time-of-use period. If the eligible customer-generator’s time-of-use electrical meter is unable to measure the flow of electricity in two directions, paragraph (1) of subdivision (c) shall apply.
agricultural customer-generator is a net electricity producer over a normal billing cycle, any excess kilowatthours generated during the billing cycle shall be carried over to the following billing period as a monetary value, calculated according to the procedures set forth in this section, and appear as a credit on the eligible commercial, industrial, or agricultural customer-generator’s account, until the end of the annual period when paragraph (3) shall apply.
either (A) provide net surplus electricity compensation for any net surplus electricity generated during the prior 12-month period, or (B) allow the net surplus customer-generator to apply the net surplus electricity as a credit for kilowatthours subsequently supplied by the electric utility to the net surplus customer-generator. For an eligible customer-generator that does not affirmatively elect to receive service pursuant to net surplus electricity compensation, the electric utility shall retain any excess kilowatthours generated during the prior 12-month period. The eligible customer-generator not affirmatively electing to receive service pursuant to net surplus electricity compensation shall not be owed any compensation for the net surplus electricity unless the electric utility enters into a purchase agreement with the eligible customer-generator for those excess kilowatthours. Every electric
utility shall provide notice to eligible customer-generators that they are eligible to receive net surplus electricity compensation for net surplus electricity, that they must elect to receive net surplus electricity compensation, and that the 12-month period commences when the electric utility receives the eligible customer-generator’s election. For an electric utility that is an electrical corporation or electrical cooperative, the commission may adopt requirements for providing notice and the manner by which eligible customer-generators may elect to receive net surplus electricity compensation.
adjacent or contiguous to the property on which the renewable electrical generation facility is located, if those properties are solely owned, leased, or rented by the eligible customer-generator. If the eligible customer-generator elects to aggregate the electric load pursuant to this paragraph, the electric utility shall use the aggregated load for the purpose of determining whether an eligible customer-generator is a net consumer or a net surplus customer-generator during a 12-month period.
12-month period.
meter that provides service at the commercial rate and 25 percent of the generation shall be allocated to each of the two meters providing service at the agricultural rate. This proportionate allocation shall be computed each billing period.
if there are any public purpose or other noncommodity charges that the eligible customer-generators would pay pursuant to the net energy metering program as it exists prior to aggregation, that the eligible customer-generator would not pay if permitted to aggregate the electrical load of multiple meters pursuant to this paragraph.
make this determination within 180 days of the first request made by an eligible customer-generator to aggregate their load. In making the determination, the ratemaking authority shall determine if there are any public purpose or other noncommodity charges that the eligible customer-generator would pay pursuant to the net energy metering or co-energy metering program of the utility as it exists prior to aggregation, that the eligible customer-generator would not pay if permitted to aggregate the electrical load of multiple meters pursuant to this paragraph. If the ratemaking authority determines that load aggregation will not cause an incremental rate impact on the utility’s customers that are not eligible customer-generators, the local publicly owned electric utility or electrical cooperative shall permit an eligible customer-generator to elect to aggregate the electrical load of multiple meters
pursuant to this paragraph. The ratemaking authority may reconsider any determination made pursuant to this subparagraph in a subsequent public proceeding.
meters pursuant to this subdivision shall remit service charges for the cost of providing billing services to the electric utility that provides service to the meters.
unaffected. The ratemaking authority shall determine whether the compensation will include, where appropriate justification exists, either or both of the following components:
(ii) The value of the renewable attributes of the electricity.
(B) In establishing the rate pursuant to subparagraph (A), the ratemaking authority shall ensure that the rate does not result in a shifting of costs between eligible customer-generators and other bundled service customers.
399.12, for net surplus electricity purchased by the electric utility shall belong to the electric utility. Any renewable energy credit associated with electricity generated by the eligible customer-generator that is utilized by the eligible customer-generator shall remain the property of the eligible customer-generator.
according to the requirements set forth in this subdivision, except that those requirements shall apply only to the months since the most recent 12-month bill.
other provisions of this section, paragraphs (1), (2), and (3) shall apply to an eligible customer-generator with a capacity of more than 10 kilowatts, but not exceeding one megawatt, that receives electric service from a local publicly owned electric utility that has elected to utilize a co-energy metering program unless the local publicly owned electric utility chooses to provide service for eligible customer-generators with a capacity of more than 10 kilowatts in accordance with subdivisions (g) and (h):
eligible customer-generator is not a time-of-use meter or is not capable of measuring total flow of electricity in both directions, the eligible customer-generator shall be responsible for all expenses involved in purchasing and installing a meter that is both time-of-use and able to measure total electricity flow in both directions. This subdivision shall not restrict the ability of an eligible customer-generator to utilize any economic incentives provided by a governmental agency or an electric utility to reduce its costs for purchasing and installing a time-of-use meter.
to which the customer would be assigned if the customer did not use a renewable electrical generation facility. The generation of electricity provided to the local publicly owned electric utility shall result in a credit to the eligible customer-generator and shall be priced in accordance with the generation component, established under the applicable structure to which the customer would be assigned if the customer did not use a renewable electrical generation facility.
costs and credits during that billing period. In any billing period in which the eligible customer-generator has been a net producer of electricity calculated on the basis of value determined pursuant to paragraph (2), the local publicly owned electric utility shall owe to the eligible customer-generator the balance of electricity costs and credits during that billing period. Any net credit to the eligible customer-generator of electricity costs may be carried forward to subsequent billing periods, provided that a local publicly owned electric utility may choose to carry the credit over as a kilowatthour credit consistent with the provisions of any applicable contract or tariff, including any differences attributable to the time of generation of the electricity. At the end of each 12-month period, the local publicly owned electric utility may reduce any net credit due to the eligible
customer-generator to zero.
performance standards established by the National Electrical Code, the Institute of Electrical and Electronics Engineers, and accredited testing laboratories, including Underwriters Laboratories Incorporated and, where applicable, rules of the commission regarding safety and reliability. A customer-generator whose renewable electrical generation facility meets those standards and rules shall not be required to install additional controls, perform or pay for additional tests, or purchase additional liability insurance.
other customer class. Net energy metering and co-energy metering customers shall not be exempt from the public goods charges imposed pursuant to Article 7 (commencing with Section 381), Article 8 (commencing with Section 385), or Article 15 (commencing with Section 399) of Chapter 2.3 of Part 1.
commission shall incorporate the determination into an existing proceeding before the commission, and shall ensure that the charges are nonbypassable. Until the commission has made a determination regarding the nonbypassable charges, net energy metering, co-energy metering, and wind energy co-metering shall continue under the same rules, procedures, terms, and conditions as were applicable on December 31, 2002.