§ 3904

Added by Stats. 1988, Ch. 259, Sec. 11.

As to any placer mining claim which has been otherwise validly located or relocated since July 20, 1935, and as to which claim the locator or relocator has not performed the work thereon required by former Sections 1426da and 1426dc of the Civil Code for the reason that literal compliance therewith was not feasible, the locator or relocator may perfect his or her claim by excavating an open cut thereon and removing from the cut not less than seven cubic yards of material if the work is completed not later than December 14, 1935.

Other sections in Chapter 1 - Manner of Locating Mining Claims, Tunnel Rights, and Millsites

This content is for reference, learning, and study purposes only. All legal text should be verified against the official California Legislative Information website, which is the authoritative source for California law. Data last processed: February 8, 2026.