Article 3 - Projects in Other Watersheds

California Water Code — §§ 12671-12749.99

Showing inline text for up to 20 sections. Open a section link to read its full text.

Sections (135)

Added by Stats. 1953, Ch. 196.

The projects on the Ventura River and tributaries for flood protection at Ventura and Ojai, California, are adopted and authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 323, Seventy-seventh Congress, First Session, at an estimated cost to the State of one hundred thirty-nine thousand dollars ($139,000).

Added by Stats. 1953, Ch. 196.

The Ventura County Flood Control District shall give assurances satisfactory to the Secretary of War that the local cooperation, required by Section 3 of the act of Congress approved December 22, 1944 (Public, Numbered 534, Seventy-eighth Congress, Second Session), will be furnished by the Ventura County Flood Control District in connection with the flood control project adopted and authorized in Section 12671.

Amended by Stats. 1957, Ch. 1932.

The project for construction of flood control protection along the Santa Clara River, and its tributaries, is approved and authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document No. 443, Eightieth Congress, First Session, and authorized by act of Congress approved June 30, 1948, Public Law 858, Eightieth Congress, Second Session, at an estimated cost to the State of such sum as may be appropriated for state cooperation by the Legislature upon approval of the general plan of improvement by, and the recommendation of, the department, when funds for carrying out the project are appropriated by Congress.

Added by Stats. 1953, Ch. 196.

The Ventura County Flood Control District shall give assurances satisfactory to the Secretary of the Army that local cooperation, required by Section 201 of the act of Congress approved June 30, 1948 (Public, Numbered 858, Eightieth Congress, Second Session), will be furnished by the Ventura County Flood Control District in connection with the flood control project adopted and authorized in Section 12673.

Added by Stats. 1953, Ch. 196.

The Ventura County Flood Control District, in conjunction with the War Department, shall execute the plans and projects referred to in Sections 12671 and 12673 and exercise all powers granted to it in the Ventura County Flood Control Act, and the district may make such modifications and amendments to the plans as may be necessary to execute them for the purposes of Chapters 1 and 2 of this part.

Added by Stats. 1953, Ch. 196.

The projects for the Santa Ana River Basin for the protection of Orange County, including the projects on Lytle and Cajon Creeks for flood protection at San Bernardino and Colton approved in the act of Congress approved June 22, 1936, as modified by the act of Congress approved June 28, 1938, are adopted and authorized substantially in accordance with the recommendations contained in the report of the Chief of Engineers dated February 11, 1944, at an estimated cost to the State of six hundred seventy-eight thousand dollars ($678,000).

Added by Stats. 1953, Ch. 196.

The San Bernardino County Flood Control District shall give assurances satisfactory to the Secretary of War that the local cooperation, required by Section 3 of the act of Congress approved December 22, 1944 (Public, Numbered 534, Seventy-eighth Congress, Second Session), will be furnished by the San Bernardino County Flood Control District in connection with the flood control project adopted and authorized in Section 12676.

Added by Stats. 1953, Ch. 196.

The San Bernardino County Flood Control District, in conjunction with the War Department, shall execute the plans and projects referred to in Section 12676 and exercise all powers granted to it in the San Bernardino County Flood Control Act, and the district may make such modifications and amendments to the plans as may be necessary to execute them for the purposes of Chapters 1 and 2 of this part.

Added by Stats. 1987, Ch. 1285, Sec. 1.

The project for flood control on the Santa Ana River Mainstem, including Santiago Creek and Oak Street Drain, is adopted and authorized substantially in accordance with the recommendations of the Chief of Engineers Conference Report No. 99-1013 99th Congress, as adopted and authorized by the act of Congress approved October 17, 1986 (Public Law 99-662, the Water Resources Development Act of 1986), at an estimated cost to the state of the sum that may be appropriated for state cooperation by the Legislature upon the recommendation and advice of the department.

Added by Stats. 1987, Ch. 1285, Sec. 2.

The Orange County Flood Control District, the Riverside County Flood Control and Water Conservation District, and the San Bernardino County Flood Control District shall give assurances satisfactory to the Secretary of the Army that the local cooperation required by the Water Resources Development Act of 1986 (Public Law 99-662) will be furnished by the districts in connection with the project for flood control adopted and authorized in Section 12678.1.

Added by Stats. 1987, Ch. 1285, Sec. 3.

The Orange County Flood Control District, the Riverside County Flood Control and Water Conservation District, and the San Bernardino County Flood Control District, in conjunction with the Department of the Army, shall execute the plans and projects referred to in Section 12678.1, may exercise all powers granted to them in the Orange County Flood Control Act (Chapter 723 of the Statutes of 1927), the Riverside County Flood Control and Water Conservation District Act (Chapter 1122 of the Statutes of 1945), and the San Bernardino County Flood Control Act (Chapter 73 of the Statutes of 1939), respectively, and may make modifications and amendments to the plans

as may be necessary to execute them for purposes of Chapter 1 (commencing with Section 12570) and this chapter.

Amended by Stats. 1957, Ch. 1932.

The plan of improvement for flood control in the Santa Ana River Basin is adopted and authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 135, Eighty-first Congress, First Session, and authorized by act of Congress approved May 17, 1950, Public Law 516, Eighty-first Congress, Second Session, at an estimated cost to the State of such sum as may be appropriated for state cooperation by the Legislature upon approval of the general plan of improvement by, and the recommendation of, the department, when funds for carrying out the project are appropriated by Congress.

Added by Stats. 1953, Ch. 196.

The San Bernardino County Flood Control District and the Riverside County Flood Control and Water Conservation District shall give assurances satisfactory to the Secretary of the Army that the local cooperation, required by Section 201 of the act of Congress approved May 17, 1950, Public Law 516, Eighty-first Congress, Second Session, will be furnished by the districts in connection with the plan of improvement for flood control adopted and authorized in Section 12679.

Added by Stats. 1953, Ch. 196.

The San Bernardino County Flood Control District and the Riverside County Flood Control and Water Conservation District, in conjunction with the Department of the Army, shall execute the plan of improvement for flood control referred to in Section 12679 and exercise all powers granted by law to the districts, and the districts may make such modifications and amendments to the plan as may be necessary to execute it for the purposes of Chapters 1 and 2 of this part.

Added by Stats. 1967, Ch. 1577.

The plan of improvement for flood control on Lytle and Warm Creeks, San Bernardino County, is adopted and authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 53, Eighty-Ninth Congress, as authorized by act of Congress approved October 27, 1965, Public Law 89-298, 79 Stat. 1073, Title II, the “Flood Control Act of 1965,” at a cost to the state of such sum as may be appropriated for state cooperation by the Legislature upon the recommendation and advice of the department. This authorization shall not be deemed to confer preference on this project over the needs of other statewide programs in appropriation of

available funds.

Added by Stats. 1967, Ch. 1577.

The San Bernardino County Flood Control District shall give assurances satisfactory to the Secretary of the Army that the local cooperation, required by the act of Congress approved October 27, 1965, Public Law 89-298, 79 Stat. 1073, Title II, the “Flood Control Act of 1965,” will be furnished by the district in connection with the plan of improvement for flood control adopted and authorized in Section 12681.1.

Added by Stats. 1967, Ch. 1577.

The San Bernardino County Flood Control District, in conjunction with the Department of the Army, shall execute the plan of improvement for flood control referred to in Section 12681.1 and exercise all powers granted to it in the San Bernardino County Flood Control Act (Chapter 73, Statutes of 1939), and the district may make such modifications or amendments to the plans as may be necessary to execute them for the purposes of Chapters 1 (commencing with Section 12570) and 2 (commencing with Section 12639) of this part.

Added by Stats. 1953, Ch. 196.

The general comprehensive plan for flood control in the basins of the Los Angeles and San Gabriel Rivers and Ballona Creek are adopted and authorized as set forth in House Document Numbered 838, Seventy-sixth Congress, Third Session, and approved in the act of Congress approved August 18, 1941, at an estimated cost to the State of twenty-two million five hundred thousand dollars ($22,500,000).

Added by Stats. 1953, Ch. 196.

The Los Angeles County Flood Control District shall give assurances satisfactory to the Secretary of War that the local cooperation, required by Section 3 of the act of Congress approved December 22, 1944 (Public, Numbered 534, Seventy-eighth Congress, Second Session) and Section 2 of the act of Congress approved August 18, 1941 (Public, Numbered 228, Seventy-eighth Congress, First Session), will be furnished by the Los Angeles County Flood Control District in connection with the plan for flood control adopted and authorized in Section 12682.

Added by Stats. 1953, Ch. 196.

The Los Angeles County Flood Control District, in conjunction with the War Department, shall execute the plans and projects referred to in Section 12682 and exercise all powers granted to it in the Los Angeles County Flood Control Act, and the district may make such modifications and amendments to the plans as may be necessary to execute them for the purposes of Chapters 1 and 2 of this part.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.

Open the section link to read its full text.