§ 40871

Amended by Stats. 1989, Ch. 676, Sec. 14.

Loads of tomatoes which are offered for delivery by a producer to a processor in accordance with the terms of a contract between them shall be given inspection as may be required without undue delay and within a reasonable time after the load arrives at the processor or other point which is specified for the inspection.

Other sections in Article 6 - Contract Inspection

This content is for reference, learning, and study purposes only. All legal text should be verified against the official California Legislative Information website, which is the authoritative source for California law. Data last processed: February 15, 2026.