Amended by Stats. 1994, Ch. 727, Sec. 4. Effective January 1, 1995.
Article 1 - Permits
California Health and Safety Code — §§ 42300-42316
Showing inline text for up to 20 sections. Open a section link to read its full text.
Sections (44)
Added by Stats. 1992, Ch. 1126, Sec. 2. Effective January 1, 1993.
Added by Stats. 1992, Ch. 1126, Sec. 3. Effective January 1, 1993.
A district may establish a program to certify private environmental professionals to prepare permit applications. The program shall provide for all of the following:
Amended by Stats. 1994, Ch. 727, Sec. 5. Effective January 1, 1995.
A permit system established pursuant to Section 42300 shall do all of the following:
Added by Stats. 1988, Ch. 1568, Sec. 28.
Whenever necessary and appropriate to ensure compliance with all applicable conditions prior to issuance of a permit to operate an article, machine, equipment, or contrivance, a district may issue a temporary permit to operate. The temporary permit to operate shall specify a reasonable period of time during which the article, machine, equipment, or contrivance may be operated in order for the district to determine whether it will operate in accordance with the conditions specified in the authority to construct.
Added by Stats. 1993, Ch. 1166, Sec. 8. Effective January 1, 1994.
In any district that has a permit system established pursuant to Section 42300, the air pollution control officer may include, in any permit issued to a Title V source, emission limits, standards, and other requirements that ensure compliance with all federal Clean Air Act “applicable requirements,” as that term is defined in regulations adopted by the Environmental Protection Agency pursuant to Title V, including those requirements specified in an applicable implementation plan as defined by Section 7602(q) of Title 42 of the United States Code, and Parts C (42 U.S.C. Sec. 7470 et seq.) and D (42 U.S.C. Sec. 7501 et seq.) of Title 1 of the Clean Air Act.
Amended by Stats. 1994, Ch. 727, Sec. 6. Effective January 1, 1995.
It is the intent of the Legislature that, in addition to their responsibilities and obligations under state and federal law, in implementing Title V, districts do all of the following, to the extent feasible:
Amended by Stats. 1996, Ch. 984, Sec. 2. Effective September 27, 1996.
Added by Stats. 1996, Ch. 284, Sec. 1. Effective January 1, 1997.
Notwithstanding any other provision of law regulating a district permit system, an owner or operator of an existing portable emissions unit may relocate that equipment within the same air basin if both of the following requirements are met:
(A) The owner or operator provides, not less than 30 days prior to the date that the equipment is relocated, written notice to the district with jurisdiction over the location to which the equipment is relocated, and any additional notice required by federal law.
(B) The existing permit conditions are at least as stringent as the permit requirements in the district with jurisdiction over the location to which the equipment is relocated.
Added by Stats. 2001, 1st Ex. Sess., Ch. 12, Sec. 2. Effective May 22, 2001.
Each district shall adopt an expedited program for the permitting of standby electrical generation facilities, distributed generation facilities, geothermal facilities, including wells, and, where applicable, natural gas transmission facilities, that ensures those facilities will be operated in a manner that protects public health and air quality. Upon request by a district, the Independent System Operator and the Public Utilities Commission shall provide any information necessary, as determined by the district, to implement this section.
Amended by Stats. 2015, Ch. 303, Sec. 322. (AB 731) Effective January 1, 2016.
district shall, in a public hearing, make all of the following findings:
Added by Stats. 2003, Ch. 479, Sec. 10. Effective January 1, 2004.
Added by Stats. 2003, Ch. 479, Sec. 11. Effective January 1, 2004.
Added by Stats. 1996, Ch. 771, Sec. 5. Effective January 1, 1997.
A district shall not require emission offsets for any emission increase at a source that results from the installation, operation, or other implementation of any emission control device or technique used to comply with a district, state, or federal emission control requirement, including, but not limited to, requirements for the use of reasonably available control technology or best available retrofit control technology, unless there is a modification that results in an increase in capacity of the unit being controlled.
Amended by Stats. 1994, Ch. 720, Sec. 1. Effective January 1, 1995.
This section applies only to air pollution control projects at existing sources, where the project is necessary to comply with emission standards or limitations imposed by law, including, but not limited to, district regulations.
Within 30 days of the date that the applicant submits the information specified in paragraph (2), the district shall commence evaluation and deem the application complete, subject to the final as-built design submittal being consistent with the preliminary engineering and design information specified in subparagraph (B) of paragraph (2), for the purpose of issuing a permit to construct. Notwithstanding the limitations of Sections 65944, 65950, and 65952 of the Government Code, if final design information results in a material change in the permit evaluation that was based on the preliminary submittal, the application shall undergo a new evaluation based on the final design and the district shall promptly notify the applicant of any further information that is necessary to complete the evaluation.
(ii)
The manufacturer’s performance warranty and the associated preliminary engineering data on which the bidding documents for the contract with the manufacturer were based.
(C) Any reasonably required information regarding an air contaminant for which emissions will increase as a result of installation of the air pollution control project.
(D) Any information necessary to make the application complete with respect to any federal requirement adopted or promulgated pursuant to the Clean Air Act (42 U.S.C. Sec. 7401 et seq.) that applies to the air pollution control project.
For projects subject to this section for which the use of continuous emission monitoring systems is required, the air quality permit conditions that relate to emissions monitored by the continuous emission monitoring systems shall be sufficient for measurements and reporting as required to meet the specified emission limit as required by the rule or regulation.
An applicant may petition the district hearing board for a variance from a requirement to install air pollution control equipment or to meet a more stringent emission standard or limitation if there is a delay in the approval of the permit to construct or permit to operate for projects under this section. The finding required by paragraph (2) of subdivision (a) of Section 42352 shall be met if the hearing board finds that the delay is not due to the lack of due diligence on the part of the applicant in the permit process, and the delay results in the inability of the applicant to legally comply with the requirement or schedule that requires the installation and operation of air pollution control equipment or achievement of a more stringent emission standard or limitation. The findings required by paragraphs (3), (4), and (5) of subdivision (a) of Section 42352 shall not apply to a variance granted pursuant to this paragraph. Paragraph (6) of subdivision (a) of Section 42352 shall apply to a variance granted pursuant to this paragraph. However, if the district requests that the applicant monitor or otherwise quantify emission levels from the source during the term of the variance pursuant to paragraph (6) of subdivision (a) of Section 42352, that monitoring or quantification required in connection with the variance shall be limited to any monitoring or quantification already being performed for the source for which the pollution control project is required. No variance shall be granted unless the hearing board makes the findings as specified in this subdivision. The hearing board shall not impose any excess emission fees in connection with the grant of the variance. In determining the term of the variance, the hearing board shall consider the period of time that the delay was not due to the lack of due diligence on the part of the applicant.
Amended by Stats. 2000, Ch. 890, Sec. 39. Effective January 1, 2001.
Any article, machine, equipment, or contrivance that is located within a district that is designated by the state board as a nonattainment area for any national ambient air quality standard and for which an authority to construct is issued on or after January 1, 1988, shall comply with any district regulation that is adopted after December 31, 1982, and that requires a reduction in emissions of any air pollutant, including any precursor of an air pollutant, that interferes with the attainment of the standard, from that article, machine, equipment, or contrivance consistent with a reasonable schedule of compliance, as determined by the district.
Amended by Stats. 2018, Ch. 59, Sec. 3. (SB 1502) Effective January 1, 2019.
be prepared whether or not the material is or would be subject to subdivision (a) of Section 25536, if the air pollution control officer determines and the administering agency concurs that hazardous air emissions of the material may result from an air release, as defined by Section 44303. The notice may be combined with any other notice on the project or permit that is required by law.
school that is located within one-quarter mile of the proposed new or modified source and to each address within a radius of 1,000 feet of the source at least 30 days prior to the date final action on the application is to be taken by the officer. The officer shall review and consider all comments received during the 30 days after the notice is distributed, and shall include written responses to the comments in the permit application file prior to taking final action on the application.
section shall be made available by the school district to the air pollution control officer.
the notice makes a good faith effort to follow the procedures prescribed by law for giving the notice, and, in these circumstances, failure of a person to receive the notice shall not affect the validity of a permit subsequently issued by the officer.
not
be deemed to limit an existing authority of a district.
requirements of this section shall not apply if the air pollution control officer determines that the application to construct or modify a source will result in a reduction or equivalent amount of air contaminants, as defined in Section 39013, that are hazardous air emissions.
pollution control officer, hazardous air emissions also means emissions into the ambient air from a substance identified in subdivisions (a) to (f), inclusive, of Section 44321.
Added by Stats. 1988, Ch. 1589, Sec. 9.
Added by Stats. 1988, Ch. 1589, Sec. 10.
Upon receiving a request, for good cause, from the principal or an authorized representative of the principal of a school, the district shall, within 24 hours, respond to the request and notify the administering agency and the fire department having jurisdiction over the school. The administering agency, upon receiving such a request, shall notify the district within 24 hours.
Amended by Stats. 2000, Ch. 890, Sec. 40. Effective January 1, 2001.
For the purposes of Sections 42301.5 to 42301.8, inclusive:
Open the section link to read its full text.
Open the section link to read its full text.
Open the section link to read its full text.
Open the section link to read its full text.
Open the section link to read its full text.
Open the section link to read its full text.
Open the section link to read its full text.
Open the section link to read its full text.
Open the section link to read its full text.
Open the section link to read its full text.
Open the section link to read its full text.
Open the section link to read its full text.
Open the section link to read its full text.
Open the section link to read its full text.
Open the section link to read its full text.
Open the section link to read its full text.
Open the section link to read its full text.
Open the section link to read its full text.
Open the section link to read its full text.
Open the section link to read its full text.
Open the section link to read its full text.
Open the section link to read its full text.
Open the section link to read its full text.
Open the section link to read its full text.